prostreetdrag
New Member
- Joined
- Jan 3, 2010
OK Guys, Here we go I have decided to start a detailed thread of my Tub/Frame notch for those interested. i recent started gutting out my trunk and tubs as most of my rust was in my factory wheel tubs and trunk area so im starting from fresh with all new sheet metal so I thought this would be a great thread for some people. I will post pics as i go along. the pics attached is what has been done so far. the pics you see is a rough cut out i still need to go thru and cut out the inner tubs and straighten all the cuts to give a nice clean straight edge to get the new steel tacked in. I also need to strip the frame to bare metal. once i have the inner tubs out i will start notching the frame. once i rough cut everything i went ahead and welded in the cross bars to strengthen frame im also going to be doing a cage and the down bars from the cage will most likely get welded into one othe the crossbars you see. I will put the cage progress in this thread as well once the tubs,notch and trunk floor is complete. The very last pic is some upper control arm braces i made as well there is a pic of one tacked in since the floor is go and easier to get to..Again i will post more pics each day there is progress.