Started out as bare walls with just 2x4's. I insulated then added plywood for the 1st 8 feet. Plywood should be better than dry wall for a garage IMO. Then built some benches and shelves. Lastly un pack the shed and get organized. The bay with the small bench(left side) is where the lift is going.
Hopefully in the next 4-6 weeks the lift will be installed. I am going with a 10,000lb Rotary symeterical 2 post lift. My ceiling is not a full 12 feet so the install is going to be custom all the way.
Here's some pics.
Hopefully in the next 4-6 weeks the lift will be installed. I am going with a 10,000lb Rotary symeterical 2 post lift. My ceiling is not a full 12 feet so the install is going to be custom all the way.