From my limited experience... I used a checker pushrod and found negligible differences in correct length. Shooting for the middle of the preload range put all the preloads well within the tolerance on mine. You can pretty easily check all of them in 30-45 minutes, but If they look the same on a couple different valves on each head, you are probably OK to just add your preload number to the longest measured.