I have been procrastinating on getting my PS tanks welded to the bottom. I finally got it done, and now the tank openings are at the bottom facing the engine. Costs $300 for that, but I didnt feel like cutting the car. Not a showcar by any means, but I just didnt want to.
I also just got the pipes done. I used 2.5" aluminum, those were expensive too.
Anyway Im just waiting on the 2.5 to 3" reducer hoses to complete it. I should have them on Monday.
The only thing I had to cut were the headlight buckets. It sits fairly low, but its higher than the old scoop. The end tanks were totally replaced, and it hangs from two J hook stype bolts right behind the header panel. I painted it black in the front, so its more stealthy.
I will take some pics, but I cant host them, I dont have the space, maybe someone else does. I just thought I would post this, in case anyone wanted to use the PS, but didnt want to cut the car up.
I also just got the pipes done. I used 2.5" aluminum, those were expensive too.
Anyway Im just waiting on the 2.5 to 3" reducer hoses to complete it. I should have them on Monday.
The only thing I had to cut were the headlight buckets. It sits fairly low, but its higher than the old scoop. The end tanks were totally replaced, and it hangs from two J hook stype bolts right behind the header panel. I painted it black in the front, so its more stealthy.
I will take some pics, but I cant host them, I dont have the space, maybe someone else does. I just thought I would post this, in case anyone wanted to use the PS, but didnt want to cut the car up.