How's the part swapping going and what's left to come in that you've ordered cam?
Posted from the TurboBuick.Com mobile app
Hey, thanks for asking! I was super busy this weekend and never had a chance to post any updates but I got some stuff done on the GN this weekend, it is as follows:
* I got the Fuel Pump hot wire kit installed and it looks pretty good, I got the gas drained out so I can pull the tank off this weekend and get the new fuel pump installed.
* I got 90% of the hood stripped of its paint and hopefully I will have time to repaint it here soon!
* I also got the wideband A/F gauge installed, and it looks pretty good as well.
* I got the scan master hooked up and working, converted it to the Scanmaster 2.2 last night to make sure that works and it does.
* I installed my Tach gauge
* I wired up the Knock gauge
* I cleaned up a bunch of the wiring under the dash that just looked a little rough.
* I got an aluminium gas pedal installed, it seems to look much nicer than the stock one.
* I got the exhaust leak I had fixed, I had a hole in the pipe.
* I picked up an LT1 MAF. - I believe I have to have the translator for this to work?
I am still waiting on my console switches from Kirban, and GN1 Performance sent me the wrong fuel regulator but I haven't been able to get a hold of them since Friday.
I am waiting on the injectors and stuff to come in from Turbo Tweak and I should be good to go for this weekend.
Thanks,
Cam