So I got a new PW39 from Cottons to replace the ATR gate I had on the car and I thought it would be a bolt on. Problem is, the flanges built into the gate are only threaded on one side. The flanges that came with the gate are threaded properly but would need to be welded on in place of the old flanges.
Do I need to get the new flanges welded to the pipes or am I good to just grab a longer bolt and throw a nut and washers on the end like I plan on doing?
Normally I can find answers by just searching but couldn't find much on this one...
Do I need to get the new flanges welded to the pipes or am I good to just grab a longer bolt and throw a nut and washers on the end like I plan on doing?
Normally I can find answers by just searching but couldn't find much on this one...