I was installing my 3" down pipe and realized that I cant swing the pipe up far enough to get the 2 bottom bolts on the turbine housing. The down pipe is right on the bottom of the heater box 
At casual glance with the GN parked next to the Monte, the boxes appear the same. But upon closer inspection, the box on the GN is clearenced to clear the down pipe. How many people have run into this on their conversions?

At casual glance with the GN parked next to the Monte, the boxes appear the same. But upon closer inspection, the box on the GN is clearenced to clear the down pipe. How many people have run into this on their conversions?