WTB: Astro Roof Weaterstrip GM#20062590

We currently have 1000 units being built. The pan seal is being built as well. They should be about 1/3rd of the cost compared to what Gm cost. At this point 90 days should be max but it should be sooner for both. We shipped them a complete moon roof assembly to speed things up.
 
We currently have 1000 units being built. The pan seal is being built as well. They should be about 1/3rd of the cost compared to what Gm cost. At this point 90 days should be max but it should be sooner for both. We shipped them a complete moon roof assembly to speed things up.

About TIME !!!!
 
We had to yank it from another manufacturer. When I heard a year I was like what! They already had it for that long.
 
BRIAN, I TAKE ONE WHEN THEY COME IN(JUST TO HAVE A SPARE) I WISH I WOULD HAVE ORDERED 10 WHEN I BUILT MY CAR
 
Top