3.8L V-8 eater
Well-Known Member
- Joined
- Jul 22, 2006
- Messages
- 1,430
Looking for some advice on the best way to install multiple devices at once. Going to wire up an LC-1 wideband set up, power logger, and alkycontrol kit.
I have the update chip for the scanmaster to display A/F ratios. My wideband set up also has a stand alone gage. Is there any benifit to using both or just ditch the w/b gage and only use the s.master???
When i tap into the green wire to read the 3 bar map what's the best way to do it considering I need it for the alky kit as well as logging boost on the p.logger???
Should I wire in 1 device at a time and verify it works before moving to the next one or will I have to back track and create more work doing it this way??? One last thing. I think I want to wire in the
low level LED and Turnon LED in the instrument panel...
I have the update chip for the scanmaster to display A/F ratios. My wideband set up also has a stand alone gage. Is there any benifit to using both or just ditch the w/b gage and only use the s.master???
When i tap into the green wire to read the 3 bar map what's the best way to do it considering I need it for the alky kit as well as logging boost on the p.logger???
Should I wire in 1 device at a time and verify it works before moving to the next one or will I have to back track and create more work doing it this way??? One last thing. I think I want to wire in the
low level LED and Turnon LED in the instrument panel...