Under Pressure
New Member
- Joined
- Feb 8, 2004
- Messages
- 635
They Were Opened Up To Sce Copper Gasket With With Extra Weld On The Bolt Side Of Flange To Make Up The Material That Was Taken Out .crossover Has Delta Date Provision . I Do Have A Block Off Plate For That I Will Throw In For $140.00 Plus Shipping Thanks Heat Shield On Driverside And Passside Was Deleted....