Hi folks, i am going to reinstall the PM back from Vac system. The problem is that I received a PM from a buddy but it doesnt have the part that connects to the fire wall with the four bolts. My question is: can I take that piece off of the Vac master cylinder and put it on the PM?? Thanks in advance!!!