I'm having my driveway redone this spring , it's 380' long to the house & side of the garage . Off the back of my drive way I have another 250' straight of unpaved driveway that then turns to my pole barn , 630' total straight . When I had an estimate for the "front" driveway it was suggested that the back could be paved for little more because it would be a one pass with the paver and rolling . This would save me from having to maintain the back with weed killer and hitting stones with the lawnmower . So this got me to thinking . What if I had concrete poured 10' wide by 80' ( one 10 yard load ) at the end away from the house then paved the rest of the way to the main driveway . That would give me room to practice launches for 60' times & be able to set up cameras to watch the suspension . Timing would be done with a Dragy and I would have plenty of room for shutdown . Any thoughts or suggestions about this ??? Sam