austinibew145
Well-Known Member
- Joined
- Apr 7, 2008
- Messages
- 1,288
You must install the line at the pump before you attach it at the hydroboost. That way you have all the play you need at the pump for twisting, tweaking, bending , although it only needs the smallest persuasion to start the threads. If you try to do it after you have installed the hose at the hydroboost you'll never have the leverage or slack to persuade it to where it needs to go to get the threads started.
i did it without removing the line. i did spend days looking for a line then i was told to remove the steel line and roll the fiting.