dank GN

BlackArts Automotive (661)993-8277
Joined
Jan 11, 2009
Messages
4,039
I just recived the razors alky kit and was woundring about how long should the install take? I have some buddys that are going to give me a hand and they keep asking me about how long it is going to take.
 
I'm a shade-tree mech and it took me about 8 hours. I think the bulk of the time was in soldering, routing the wires and making sure everything was neat.

I was a first time installer of something like this too. With a couple of buddies with wiring experience should take half that. With a couple of buddies like mine it could take the whole weekend...
 
Reserve the whole weekend and you will have a good looking and trouble free install. Don't get in a hurry.
 
with a few buddies it will go quick. Have 1 or 2 under the hood have the other in the car working. Takes me about 2 1/2 to 3 hours to do it myself. But I have done a few to say the least
 
I never did one before and it took me 8-10 hrs. with a break or two. I could have done it quicker but double/triple checked everything as I went along and I also went an extra step when I integrated the controller with my stereo and scanmaster in the stock stereo opening. No big deal but it took some extra time.

I just "upgraded " the system by installing the Metco spare tire well fuel cell and that was more work than installing the system originally. Julio made it much easier than I would have had it if I went about it on my own.
 
Start now. Should have no problem getting it going by Thanksgiving.lol
 
I never did one before and it took me 8-10 hrs. with a break or two. I could have done it quicker but double/triple checked everything as I went along and I also went an extra step when I integrated the controller with my stereo and scanmaster in the stock stereo opening. No big deal but it took some extra time.

I just "upgraded " the system by installing the Metco spare tire well fuel cell and that was more work than installing the system originally. Julio made it much easier than I would have had it if I went about it on my own.

Good now ya can help with mine!
 
2 1/2 hours. I did it alone with no friends there to distract me. But, I am a "kanic" by trade.
 
8-10 hours split over 3 days , double checking everything , first time install for me ,and also when it comes to wiring stuff i do it solo ..to many hands spoil the pot type of thing. also careful with the power injection bulb the soldered leads can break on you
 