Well, I e-mailed Bruce and his office replied stating that the 6.5" rods i have wont work in the engine, and that as soon as I get them a set of rods...the engine would be completed asap. So I then in return asked that they use what's in my deposit to get the rods it does need, so we'll see what the reply will be tomorrow I assume lol. I stated to Bruce that he had 2 weeks to get the engine done and ready to go in the car...and if more $$ is needed to send me a COMPLETE breakdown of what has been bought versus what is still needed so I can see where the $$ on my deposit has been spent. 2 weeks is it...its CRUNCH time...git er done. I want to atleast beable to make the "Woodward" cruise this year with it

Cmon Bruce... I know you and the machine shop people read this....grab 2nd gear and mash the petal on it